Search Results for: H12-621_V1.0 Valid Exam Preparation 😌 New H12-621_

Reforestation: costs of CO2 removals?

Reforestation costs

Reforestation costs are modelled in this data-file, acquiring pastureland, planting new forests to absorb CO2, over a 50-year cycle. As a good rule of thumb, we think $50/ton CO2 prices,…

Power transmission: the economics?

This data-file captures the costs of AC power transmission, requiring a 1.5c/kWh spread to earn a 10% levered IRR on a new 100km and 1,000MW transmission line, with capex costs…

CO2 of metal components: conventional vs additive manufacturing?

CO2 of metal components

…of additively manufactured processes versus conventional manufacturing processes in kWh/kg and kgCO2e/kg. The calculations include material costs, preparation, machining and additive manufacturing itself. Our numbers are based on technical papers….

Tigercat: forestry and timber innovations?

Tigercat patent review

…harvesting equipment, such as feller-bunchers, mulching equipment, and novel areas that may matter in the energy transition such as site preparation, re-planting and biochar production. These are all focus areas…

Copyright: Thunder Said Energy, 2019-2024.