Hydrogen: overview and conclusions?

Hydrogen best opportunities?

…want to decarbonize the global energy system. It therefore seems strange to take 100MWH of usable, high-grade, low-carbon electricity, and convert it into 40MWH of hydrogen energy, when you could…

CO2 intensity of materials: an overview?

CO2 intensity of materials

This data-file tabulates the energy intensity and CO2 intensity of materials, in tons/ton of CO2, kWh/ton of electricity and kWh/ton of total energy use. The build-ups are based on 160…

Residential energy consumption over time?

US residential energy consumption runs at 3,000 MWH per annum, equivalent to one quarter of total US energy consumption. Total demand has run sideways since 1980 as rebound effects and…

Fans and blowers: costs and energy consumption?

Fans and blowers

…$200/kW equipment costs and 0.3kWh/ton of energy consumption. 3,000 tons of air flow may be required per ton of CO2 in a direct air capture (DAC) plant. $499.00 – Purchase Checkout Added…

Energy transition: ten positive themes?

Positive themes in energy transition

…consider. There is great opportunity incubating these technologies, developing these value chains, and delivering these improvements to global energy and materials consumers. $449.00 – Purchase Checkout Added to cart https://thundersaidenergy.com/2023/09/28/new-energies-the-age-of-materials/ https://thundersaidenergy.com/2023/08/24/industrial-ecosystems-on-the-shoulders-of-giants/ https://thundersaidenergy.com/2023/06/29/omniscience-how-will-ai-reshape-the-energy-transition/…

Building energy infrastructure: constructive margin?

Distribution of capex costs of construction, engineering, equipment, materials, and misc for different types of projects. The average for construction costs are 40%.

…sectors, those with the most specialized skill-sets, and those with particular specialization into power grid infrastructure. These companies are profiled on pages 9-10. $499.00 – Purchase Checkout Added to cart https://thundersaidenergy.com/2024/02/28/global-energy-capex-building-in-boom-times https://thundersaidenergy.com/downloads/engineering-and-construction-companies-screen…

Data-centers: the economics?

Financial model over 25 years for a model data-center.

…proportionate hardware costs and may lower the proportionate energy costs (see ComputePerformance tab). An AI-enabled data-center can easily cost 2x more than a conventional one, surpassing $20M/MW. Reliability is also…